| Bug #4576 | MySQL Backup Scheduler failer with Windows 2000 | ||
|---|---|---|---|
| Submitted: | 16 Jul 2004 16:06 | Modified: | 16 Jul 2004 19:09 |
| Reporter: | Thierry Hafner | Email Updates: | |
| Status: | Closed | Impact on me: | |
| Category: | MySQL Administrator | Severity: | S2 (Serious) |
| Version: | 1.0.6 Beta Win | OS: | Windows (Windows NT 2000) |
| Assigned to: | CPU Architecture: | Any | |
[16 Jul 2004 19:09]
Michael G. Zinner
Thank you for your bug report. This issue has been committed to our
source repository of that product and will be incorporated into the
next release.
If necessary, you can access the source repository and build the latest
available version, including the bugfix, yourself. More information
about accessing the source trees is available at
http://www.mysql.com/doc/en/Installing_source_tree.html

Description: I want to backup two different Databases with the scheduler. - After setting all the parameter for to first DB, I have saved the project. -> Then, I made a new project and saved it as well. --> Following error is showing up: MySQL Administrator System Error Cannot schedule the backup task. System Error Nr.3806 "Die AT-Auftragskennung existiert nicht" ---> Press Enter and the foucs is back on the "Save Project" button, press the button again and, it is overwriting the first backup project and the job is not running at all How to repeat: -> Prepare two DB. --> enter first Backup Project with first db and save it ---> enter second Backup Project with the second db and save it