Bug #39014 rpl.rpl_sporadic_master failed on pushbuild: "could not parse relay log entry"
Submitted: 25 Aug 2008 16:19 Modified: 20 Mar 2009 3:15
Reporter: Sven Sandberg Email Updates:
Status: Can't repeat Impact on me:
None 
Category:Tests: Replication Severity:S7 (Test Cases)
Version:6.0-bugteam OS:Any
Assigned to: Guangbao Ni CPU Architecture:Any
Tags: pushbuild, relay log corruption, rpl_sporadic_master, test failure

File: Maximum allowed size is 50MB.
Description:
Privacy:

If the data you need to attach is more than 50MB, you should create a compressed archive of the data, split it to 50MB chunks, and upload each of them as a separate attachment.

To split a large file: